Build and test an AI MVP in weeks

Test the first build and plan the production decision.

Turn requirements into structured markdown, settle gaps with your experts and pair through the first build. At PPL, that produced a two-week greenfield working proof of concept, which did not enter production. Production work is a separate 90-day programme for one agreed workflow.

Book a 30-minute call

30 minutes with James · how this would work in your organisation

Theme
How it is built
Read time
2 minutes
Questions answered
5 in full
Updated
Evidence basisOur approach
Usually engaged as
Agentic Proof of Concept. 2–4 weeks, Fixed price · £20k–£55k.
see the engagement →
Evidence basis

The basis for this approach

This is our approach to a bounded first build. The PPL example was one greenfield working proof of concept with one client engineer; it is not a repeatable two-week production promise.

On this page

The demand signal

PPL’s requirements were converted to structured markdown, gaps were resolved with subject-matter experts and the build began from a blank Azure repository. In two weeks the document-to-BI proof of concept worked. Nothing moved into production and no regulatory or audit position changed.

Bring the reason this is on your agenda to a 30-minute call with James, and we can explore what it would take in your organisation.

Book a 30-minute call

Why it stalls

2 failure modes we keep meeting

The requirements change shape between handoffs

PDFs, diagrams and conversations can leave contradictions unresolved. Build one structured requirement corpus so the people specifying, building and accepting the work can test the same intent.

A short build is mistaken for a production release

A working first version still needs the evidence, controls, ownership and adoption work for production. Keep that decision and its budget separate from the prototype.

If one of these sounds familiar, bring it to a 30-minute call with James and we can explore a way past it.

Book a 30-minute call

How we approach it

3 moves, in order

  1. 01

    Settle the uncertain requirement first

    Convert the requirements, map their relationships and run the gap-and-contradiction pass. Resolve those questions with your subject-matter experts before committing code to the approach.

  2. 02

    Pair on one bounded workflow

    Build against the whole requirement set with your own engineer involved throughout. At PPL the greenfield build included security review roughly every fifth prompt; that example was a proof of concept, not production.

  3. 03

    Use the result to choose the next scope

    The published proof of concept is two to four weeks at £20,000–£55,000 fixed. It leaves a go/no-go decision and a fixed quote for the separate 90-day programme, with completed design coming off the quote.

The published proof of concept is two to four weeks at £20,000–£55,000 fixed.
Ask a technical questionanswers from all 34 guides
Ask anything technical about build and test an AI MVP in weeks and I will answer from this guide, and tell you first whether this is work we have delivered or an approach we would be taking.

Prefer to talk it through? Ask us on a discovery call →

Sources

Every source below was opened and read before it was attached. Where nothing survived that check, the claim on this page was softened rather than given a plausible-looking link.

PPL, the two-week working proof of conceptOne greenfield build paired with one client engineer. Nothing moved into production and no regulatory or audit position changed.Tenhaw, Agentic Proof of ConceptTenhaw, 90-day outcome programme
engage via

Work out the next step for your team.

A 30-minute call with James Rooney to discuss your workflow, people and budget. Leave with a rough scope and a useful next step.

Agentic Proof of Concept · £20k–£55k fixed · 2–4 weeks · excluding VAT

// pick a slot · cal.com/tenhaw/professional-servicesLIVE CALENDAR

No time that suits? Email hello@tenhaw.com. Calendar not loading? Open it on cal.com.

Describe the work

Describe the work in a paragraph. James replies with a rough scope and budget range within two working days.

Send James a paragraph about the work

We use these details to respond to your enquiry. Read our privacy notice.

Questions this guide answers

How small should the MVP be?

Choose one workflow and the uncertainty you need to test. Agree the examples and acceptance decision with the team so a small build can settle something useful rather than merely demonstrate a feature.

What makes weeks realistic?

The PPL example combined a bounded greenfield scope, structured requirements, subject-matter experts resolving gaps and one client engineer pairing throughout. It was one working proof of concept in two weeks, not a general timeline promise.

What is not ready after an MVP?

Production reliability, assurance, operating ownership and adoption at scale still need evidence and a separate decision. PPL’s build did not enter production or change a regulatory or audit position. This is not legal advice.

Who owns the code?

Code is built in your repositories. Client-specific deliverables, documentation and code become yours on payment of the applicable fees, and your engineers pair so they learn the method during the build.

What does the first build cost?

Tenhaw’s Agentic Proof of Concept is £20,000–£55,000 fixed, excluding VAT, over two to four weeks. The 90-day programme is a separately agreed £120,000 or £180,000 fixed production scope.